Skip to main content

SISD C.E. King Band Tower

Scope of work: Provide and install dedicated electrical circuit and pathway to band tower. Install 4 duplex GFCI receptacles mounted in ground box. Install 2 receptacles at top of band tower. Remove topsoil and associated landscaping to correct elevation and lay 17’x17’x24” concrete foundation.  Provide PE drawings for band tower and foundation. Repair irrigation and landscaping.

Close Menu

14026 FM 2100

Crosby, TX 77532

T: (281) 328-2200

E:[email protected]